NRE – Non Recurring Engineering

What is NRE? NRE cost (non-recurring engineering) refers to any fee you have to spend as a one-off cost on a new product development project.

The list of NRE costs for electronics

  • System Design
  • Industrial Design
  • Mechanical Design
  • Firmware
  • Prototyping
  • Tooling
  • Certifications

These up-front costs cover the process of taking a product from an idea to final prototypes ready for mass manufacturing.

Table of Contents

CONTINUE READING ABOUT NRE (NON-RECURRING-ENGINEERING)

NRE Breakdown and Calculator 

How to reduce manufacturing costs?

PCBA Assembly Cost – 10 Ways to Save Money Long Term